2015年10月22日星期四

Solar Lights For Decking

Solar Light Manufacturers, Solar Lantern Manufacturers, Solar Lights China

Theconcrete is completely solidified(usually 72 hours or more),and the installation ofthe pendant lamp can be carried out.Three,solar cell module installation1,component,the battery output positive and negative pole connected to the front of the controllermeasures shall be taken to avoid short circuit;2,the solar cell component is connectedwith a support should be solid and reliable;3,the components of the output line shouldavoid bare,and tie fastened;4,battery components toward to toward the south,with thecompass pointing to the quasi.Four,battery installation1,the battery should be placedin the control box gently,prevent damage control box;2,the connecting line of thebattery must be used to press on the battery's terminal and use copper to enhance theelectrical conductivity;3,the output line is connected to the battery in any case,toavoid damage to the battery;4,the battery output line with the wire rod in thecontroller must pass through the PVC line pipe;5,after the completion of the above,check the wiring of the controller,to prevent the short circuit.See the schedule forspecific installation:Five,lamp installation1.Each part of the assembly is fixed:solar panel fixed on the solar plate support and the lamp head is fixed to pick arm,then the frame and cantilever fixed to the main rod,and the connecting wire threadingto the control box(battery box).2.Before the lifting of the lamp post,first check thevarious parts of the fasteners are firmly,lamp whether the correct installation of,light is working properly.Then in simple debugging system is working properly;loosenthe controller of solar panels connected line,working light source;connected to thesolar panels connected line,lights out;at the same time careful observation controlleron the indicating lamp changes;everything is normal,lifting installation.3,the mainpole lifting,pay attention to the safety precautions;screw absolutely good fastening,such as component Chaoyang angle biased and need to end up to adjust the direction ofthe sun rising completely toward the south.FourThe battery into the battery box,inaccordance with the technical requirements of the connecting line to the controller;thebattery,then the load,and then the solar panel.


For more details Click Here.

没有评论:

发表评论